Dashboard overview
Engineer tasks
Separate tracker for engineering work, task type and status.
Purchase items
Separate tracker for purchase requirements and status.
Maintenance Dashboard
Monitor task completion and upcoming maintenance activity.
Dashboard filters
Filter performance by period, selected week and maintenance section.
Maintenance activity
Maintenance activity — January to December 2026
Maintenance activity
Completion status — January to December 2026
Weekly maintenance interface
Click a maintenance task to copy it, then click a date cell to paste it. Left-click an arrow to edit; right-click it to change status. Drag an arrow to reschedule.
| No. | Job / Task | Section | Equipment / Asset | Manpower | Monday 23 Nov 2026 | Tuesday 24 Nov 2026 | Wednesday 25 Nov 2026 | Thursday 26 Nov 2026 | Friday 27 Nov 2026 | Saturday 28 Nov 2026 | Sunday 29 Nov 2026 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | PM Routine | Batch Plant | EV weighing Dolomite | Wan MH & Team | — | — | — | — | — | — | |
| 2 | PM Finding Repair | Batch Plant | EV weighing Dolomite | Wan MH & Team | — | — | — | — | — | — | |
| 3 | PM Routine | Batch Plant | EV gathering CV & mixer | Wan MH & Team | — | — | — | — | — | — | |
| 4 | PM Finding Repair | Furnace | Batch Charger 1-4 | Syed & Haikal | — | — | — | — | — | ||
| 5 | Support & assist Operation/Mechanical | Furnace | Firing Exchange valve 4P Right | Syed & Haikal | — | — | — | — | — | — | |
| 6 | PM Routine | Bath | O2 analyser for N2 & H2 | OGM/Syed & Haikal | — | — | — | — | — | — | |
| 7 | TRT/Hot Clean | Bath | Blower HP, BBCF | Shift Utility | — | — | — | — | — | — | |
| 8 | TRT/Hot Clean | Cold end | 5D Scanner | Joseph & Zuhairi | — | — | — | — |
Upcoming & recently updated
| Equipment / task | Due date | Frequency | Assigned to | Status |
|---|---|---|---|---|
Replace exchange valveFiring Exchange valve 4P Right · Support & assist Operation/Mechanical | 27 Nov 2026 | One-off | Syed & Haikal | Open/Pending |
Replace blower fan EV weighing DolomiteEV weighing Dolomite · PM Finding Repair | 24 Nov 2026 | Monthly | Wan MH & Team | Open/Pending |
Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean | 19 Nov 2026 | 2week | Shift Utility | Overdue |
Weight test and calibrationWeighing system Raw material · PM Routine | 17 Nov 2026 | 6month | Syed & Haikal | Close/Completed |
Lay new cable for emergency siren and testEmergency Siren · PM Finding Repair | 30 Nov 2026 – 02 Dec 2026 | One-off | Syed & Haikal | Open/Pending |
Maintenance records
Create, update, search and manage your maintenance tasks.
| No. | Job / Task | Planned date (From – To) | Frequency | Manpower | Status | Actions |
|---|---|---|---|---|---|---|
| 1 | Cleaning Hopper Dust CollectorDC Main BP · PM Routine | 27 Oct 2026 | Monthly | Wan Mahassan | ||
| 2 | H2 analyser line 1 & 2 calibration by OGMH2 analyser Gas Mixing Room · TRT/Hot Clean | 26 Oct 2026 | Yearly | OGM & Haikal | ||
| 3 | Top Roll 5A Swap with spare unitTop Roll 5A · TRT/Hot Clean | 26 Oct 2026 | Quarterly | Haikal | ||
| 4 | Spare part list ElectricalBatch Plant area · PM Routine | 26 Oct 2026 – 30 Oct 2026 | Daily | Haikal | ||
| 5 | PM CheckingCullet Conyevor system · PM checking (Checksheet) | 28 Oct 2026 | Monthly | Haikal | ||
| 6 | Cleaning hopper Dust CollectorDust Collector 1 · PM Routine | 24 Oct 2026 | Monthly | Wan Mahassan | ||
| 7 | Cleaning hopper Dust collectorDust Collector 2 · PM Routine | 24 Oct 2026 | Monthly | Wan Mahassan | ||
| 8 | SIP project Smoke DetectorHot end Smoke Detector · Safety Improvement Plan (Special Job) | 04 Nov 2026 – 07 Nov 2026 | One-off | Syed & Haikal | ||
| 9 | LOTO Mixer 3Mixer 3 · Support & assist Operation/Mechanical | 28 Oct 2026 | 2week | Haikal | ||
| 10 | Replace exchange valveFiring Exchange valve 4P Left · Support & assist Operation/Mechanical | 29 Oct 2026 | One-off | Haikal | ||
| 11 | Weight test and calibrationWeighing system Raw material · PM Routine | 17 Nov 2026 | 6month | Syed & Haikal | ||
| 12 | 5S housekeepingAll Dust Collector · 5S & Housekeeping | 03 Nov 2026 | One-off | Wan Mahassan & Team | ||
| 13 | Replace ITV monitor - 4pcsITV Camera CCTV system · Corrective/Repair Maintenance | 02 Nov 2026 | One-off | Haikal & Fazreen | ||
| 14 | Assit Swap Top roll 5A & 5CTop Roll 5A & 5C · TRT/Hot Clean | 03 Nov 2026 | Quarterly | Shift Utility | ||
| 15 | Repair install bracket solenoid valveBatch Charger 1-4 · PM Finding Repair | 10 Nov 2026 – 14 Nov 2026 | One-off | Syed & Haikal | ||
| 16 | Replace Lehr Break sensor centreLehr Break 1 · TRT/Hot Clean | 11 Nov 2026 | One-off | Syed & Haikal | ||
| 17 | Cleaning ITV PanelITV Camera CCTV · PM Routine | 30 Oct 2026 | Monthly | Syed & Haikal | ||
| 18 | Check TC A zone Top Right & Adjust positionLehr TC A zone Top Right · TRT/Hot Clean | 03 Nov 2026 | One-off | Production | ||
| 19 | Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean | 03 Nov 2026 | 2week | Shift Utility | ||
| 20 | PM checking Batch PlantBatch Plant area · PM checking (Checksheet) | 02 Nov 2026 | Monthly | Haikal | ||
| 21 | Check Heater A zone Top B, C, DLehr Heater A zone Top B, C, D · TRT/Hot Clean | 03 Nov 2026 | One-off | Syed & Haikal | ||
| 22 | Test and Replace blower fanEV Weighing Dolomite · Corrective/Repair Maintenance | 04 Nov 2026 – 05 Nov 2026 | One-off | Wan Mahassan/Syed & Haikal | ||
| 23 | Check damper C zone bottom rightLehr damper C zone bottom Right · TRT/Hot Clean | 03 Nov 2026 | Monthly | Syed & Haikal | ||
| 24 | O2 analyser calibration by OGMO2 analyser for N2 & H2 · PM Routine | 26 Nov 2026 | Yearly | OGM/Syed & Haikal | ||
| 25 | Replace heater A zone Top B1Lehr Heater A zone Top B1 (FR1) · TRT/Hot Clean | 03 Nov 2026 | One-off | Syed & Haikal | ||
| 26 | PM checking Lehr areaLehr area · PM checking (Checksheet) | 03 Nov 2026 | Monthly | Syed & Haikal | ||
| 27 | PM checking Batch PlantSilica sand area · PM checking (Checksheet) | 05 Nov 2026 | Monthly | Syed & Haikal | ||
| 28 | Check Heater A zone Top & BottomLehr Heater A zone Top & Bottom · TRT/Hot Clean | 11 Nov 2026 | One-off | Syed & Haikal | ||
| 29 | PM checking cullet conveyor systemCullet Conveyor system · PM checking (Checksheet) | 12 Nov 2026 | Monthly | Syed & Haikal | ||
| 30 | Replace Lehr Break sensor centre & rightLehr Break 1 · TRT/Hot Clean | 19 Nov 2026 | One-off | Syed & Haikal | ||
| 31 | Annual servicing & calibration5D Scanner · TRT/Hot Clean | 25 Nov 2026 – 27 Nov 2026 | Yearly | Joseph & Zuhairi | ||
| 32 | Replace Thermocouple Tin Bay 13LTin Bay 13L · TRT/Hot Clean | 11 Nov 2026 | One-off | Shift Utility | ||
| 33 | PM checking batch plant areaBatch Plant area · PM checking (Checksheet) | 10 Nov 2026 | Monthly | Syed & Haikal | ||
| 34 | Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean | 19 Nov 2026 | 2week | Shift Utility | ||
| 35 | Cleaning and Servicing EV weighing DolomiteEV weighing Dolomite · PM Routine | 23 Nov 2026 | Monthly | Wan MH & Team | ||
| 36 | Replace blower fan EV weighing DolomiteEV weighing Dolomite · PM Finding Repair | 24 Nov 2026 | Monthly | Wan MH & Team | ||
| 37 | Cleaning and Servicing EV gathering CV & mixerEV gathering CV & mixer · PM Routine | 27 Nov 2026 | Monthly | Wan MH & Team | ||
| 38 | PM checking batch plant areaBatch Plant area · PM checking (Checksheet) | 16 Nov 2026 | Monthly | Syed & Haikal | ||
| 39 | PM checking Distributor, Batch & B+C areaDistributor, Batch & B+C area · PM checking (Checksheet) | 18 Nov 2026 | Monthly | Syed & Haikal | ||
| 40 | PM checking bath areaBath area · PM checking (Checksheet) | 20 Nov 2026 | Monthly | Syed & Haikal | ||
| 41 | Assit Swap Top roll 6A & 6CTop Roll 6A & 6C · TRT/Hot Clean | 19 Nov 2026 | Quarterly | Shift Utility | ||
| 42 | Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean | 26 Nov 2026 | 2week | Shift Utility | ||
| 43 | Repair install bracket solenoid valveBatch Charger 1-4 · PM Finding Repair | 25 Nov 2026 – 27 Nov 2026 | One-off | Syed & Haikal | ||
| 44 | Lay new cable for emergency siren and testEmergency Siren · PM Finding Repair | 30 Nov 2026 – 02 Dec 2026 | One-off | Syed & Haikal | ||
| 45 | Replace exchange valveFiring Exchange valve 4P Right · Support & assist Operation/Mechanical | 27 Nov 2026 | One-off | Syed & Haikal |
Engineer tasks & purchase items
Separate records from the weekly maintenance schedule. Each list has its own task, task type and status.
Add engineer task
Record an engineering task and track progress.
Add purchase item
Track a purchase requirement separately.
Engineer task register
Use Edit to change the task, task type or status. Click a dashboard summary to open matching records.
| No. | What task? | Task type | Status | Actions |
|---|---|---|---|---|
| 1 | Update Yield loss October 2026 | Maintenance Report | ||
| 2 | H2 analyser calibration job | Maintenance work | ||
| 3 | Create and establish SOP weighing calibration Batch Plant | SOP document | ||
| 4 | Weighing calibration batch plant job Nov 2026 17/11/2026 | Maintenance work | ||
| 5 | Update and compile PM Dust collector September 2026 | Performance Monitoring Report | ||
| 6 | Update and compile PM Dust collector October 2026 | Performance Monitoring Report | ||
| 7 | Update spare part list Batch Plant | Maintenance inventory | ||
| 8 | Update spare part list Furnace | Maintenance inventory | ||
| 9 | Update spare part list Bath | Maintenance inventory | ||
| 10 | Update spare part list Lehr | Maintenance inventory | ||
| 11 | 2F PCP Screw conveyor modification project (CAPEX) | Maintenance Improvement Project | ||
| 12 | O2 analyser calibration job | Maintenance work | ||
| 13 | 5D scanner annual calibration and service + PC slave issue (25~27/11) | Maintenance work | ||
| 14 | SIP - Smoke detector at unmanned area HE | Maintenance Improvement Project | ||
| 15 | SIP - Dust Collector Display Parameter DC3 | Maintenance Improvement Project | ||
| 16 | Install bracket for solenoid valve batch charger 1-4 | Maintenance work | ||
| 17 | Energy saving - CE compressed air energy optimization | Maintenance Energy Saving Project | ||
| 18 | Energy saving - Main water pump flow optimization inverter | Maintenance Energy Saving Project | ||
| 19 | SCR weighing batch plant replacement | Maintenance work | ||
| 20 | Attend Technical Seminar Bag Filter competency for CPD December 2026 | Maintenance Competency CePBFO | ||
| 21 | Conduct training class for Dust Collector to renew CPD November 2026 | Maintenance Competency CePBFO | ||
| 22 | Glass level camera new replacement (CAPEX) | Maintenance Improvement Project | ||
| 23 | Flowmeter Installation for Airflow Verification and Dedicated CEMS UPS (CAPEX) | Maintenance Improvement Project | ||
| 24 | Hot end transmitter calibration | Maintenance work | ||
| 25 | Submit CPD point for Bag Filter competency (CePBFO) | CPD Summary report | ||
| 26 | Coordinate and plan Training/briefing SOP power failure DG Run (Week 45) | Maintenance Training | ||
| 27 | Cullet Vibrator 3B suspect winding Finding - amp abnormal | PM checking (checksheet) Finding | ||
| 28 | Dust Collector 2 Finding - Impeller abnormal sound and purging malfunction | PM checking (checksheet) Finding | ||
| 29 | MFO Left side Finding - Air regulator valve leak/broken | PM checking (checksheet) Finding | ||
| 30 | Mixer 3 Finding - Plate motor abnormal sound (fan motor area) | PM checking (checksheet) Finding | ||
| 31 | Screw CV Dolomite Finding - Motor insulation test low under 1Mohm need to check | PM checking (checksheet) Finding | ||
| 32 | Screw CV Limestone Finding - Motor insulation test low need to check | PM checking (checksheet) Finding | ||
| 33 | Silica sand CV 1 Finding - Motor abnormal sound needs to replace | PM checking (checksheet) Finding | ||
| 34 | Update and compile PM Dust collector November 2026 | Performance Monitoring Report | ||
| 35 | Install new filter for panel inverter combustion fan no.1 & 2 | Maintenance work |
Purchase item register
Track model/part number and purchasing status separately from engineer tasks and maintenance records.
| No. | Purchase item / task | Model / part number | Supplier / Contractor | Quantity | Status | Actions |
|---|---|---|---|---|---|---|
| 1 | Repair vibrator motor live bottom hopper mixer 2 | Vibrator motor | Asia Marine | 1 | ||
| 2 | Temperature controller (CVD) | Eurotherm 3500 series | Watlow | 1 | ||
| 3 | SCR eurotherm 250A | Eurotherm SCR | Watlow | 2 | ||
| 4 | Braking resistor | Yaskawa LKEB-42P2 OP | Yaskawa | 2 | ||
| 5 | TC Lehr Top A,B,C zone | Local Type K | CTAE | 2 | ||
| 6 | Differential Pressure | HK DPT-2W | CTAE | 1 | ||
| 7 | ITV cctv camera | Dahua SDZ4032-HNR-ZB | Epitronic | 2 | ||
| 8 | SCR eurotherm 160A | Eurotherm SCR | Watlow | 2 | ||
| 9 | Airflow controller, sensor & cable | SIGMA05-HS1D2GA6U1, EE671 | CTAE | 1 | ||
| 10 | PSU Stacker | Block PC-0324-200-2 | Maxzone | 2 | ||
| 11 | Catridge filter Dust Remover | REDClean NFR | AAF | 8 | ||
| 12 | Repair U magnet Mixer 3 | U magnet | Asia Marine | 1 | ||
| 13 | IPC Tester for ITV camera configuration | IPC Tester All-in-one | KVC | 1 | ||
| 14 | Front tweel sensor | Shinko Electric LV5-100-MSA-SLB | NSGE | 1 | ||
| 15 | Switch amplifier for water spray mixer | KFA6-SOT2-EX2 | KVC | 1 | ||
| 16 | ITV Monitor with bracket | DELL 31.5" S3225QS | Optimized | 4 | ||
| 17 | Microphone | PM222 | Lyewee | 5 | ||
| 18 | Glass catridge fuse | 5A T | RS Pro | 20 | ||
| 19 | Purchase cyclo drive 1.5kw with brake | CHHM2-6145-B-87 | Sumitomo | 1 | ||
| 20 | Refurbish/Repair Lehr Heater 9KW | Lehr Heater 9KW A Zone Top D6 | LES | 1 | ||
| 21 | Refurbish/Repair Lehr Heater 10KW | Heater 10KW A Zone Top C2 | LES | 1 | ||
| 22 | Filter lens for glass level camera | MIDOPT NI060-30.5 | ESM | 2 | ||
| 23 | Yokogawa transmitter calibration | SVC01TS1001 | Yokogawa | 3 | ||
| 24 | Solenoid valve for water spray mixer | PU225-20A-AC220V | KVC | 1 | ||
| 25 | High temperature glass firing & gasket | GLASS SIZE: 4MM , 580 DEGREE | LES | 1 | ||
| 26 | RJ45 CAT6A SHIELDED | ZOERAX RJ45 | LES | 20 | ||
| 27 | Graphic Terminal Inverter Schneider | VW3A1111 | KVC | 2 | ||
| 28 | Graphic Terminal Mounting Inverter Schneider | VW3A1112 | KVC | 2 | ||
| 29 | Bush Male 2" X Female 3/4" | Size Male 2" X Female 3/4" | RS Pro | 2 | ||
| 30 | MicroSD Memory Card | Kingston 64GB | CTAE | 2 | ||
| 31 | Waveshare USB to RS485 Bidirectional | Waveshare USB to RS485 | LES | 1 | ||
| 32 | Airflow controller and pitot tube | EYC PHD330-301-M-D1, AFMP-042-710mm | REX | 1 | ||
| 33 | Cable for microphone | Belden 8761 | CTAE | 50 | ||
| 34 | Lehr SO2 control valve rotate valve and calibration work | Samson 3277 | Azbil | 1 | ||
| 35 | Thermometer Dust Collector | UNIJIN T110 | — | 1 | ||
| 36 | Refurbish/Repair Lehr Heater 9KW | Lehr Heater 9KW A Zone Top B1 | LES | 1 | ||
| 37 | Plastic Tubing Dust Collector SIP | Festo PUN-H-8X1,25-NT | KVC | 100 | ||
| 38 | Repair/Service Exchange Valve Firing | Exchange Valve 4P Left | Yellico | 1 | ||
| 39 | Thermocouple Type K CVD Canister | Type K L = 1200MM | CTAE | 2 | ||
| 40 | Strainviewer sensor | Telemecanique XUB5APANM12 | — | 2 | ||
| 41 | Angle Grinder tools | Makita GA4040C | — | 1 |
Maintenance reports
Review performance and print a clean report or save it as PDF.
Maintenance register
Generated 24/11/2026, 10:24:02 am
| No. | Job / Task | Planned date (From – To) | Frequency | Manpower | Status | Notes |
|---|---|---|---|---|---|---|
| 1 | Cleaning hopper Dust CollectorDust Collector 1 · PM Routine | 24 Oct 2026 | Monthly | Wan Mahassan | Cleaning hopper due to DP gauge above limit 150mmWG. suspect filter bag choked. | |
| 2 | Cleaning hopper Dust collectorDust Collector 2 · PM Routine | 24 Oct 2026 | Monthly | Wan Mahassan | Cleaning hopper due to DP gauge above limit 150mmWG | |
| 3 | H2 analyser line 1 & 2 calibration by OGMH2 analyser Gas Mixing Room · TRT/Hot Clean | 26 Oct 2026 | Yearly | OGM & Haikal | H2 analyser line 1 & 2 calibration by OGM annually | |
| 4 | Top Roll 5A Swap with spare unitTop Roll 5A · TRT/Hot Clean | 26 Oct 2026 | Quarterly | Haikal | Top Roll 5A cancelled swap due to spare unit problem with up & down movement stuck | |
| 5 | Spare part list ElectricalBatch Plant area · PM Routine | 26 Oct 2026 – 30 Oct 2026 | Daily | Haikal | PM routine checking for spare part list electrical part | |
| 6 | Cleaning Hopper Dust CollectorDC Main BP · PM Routine | 27 Oct 2026 | Monthly | Wan Mahassan | Cleaning hopper due to DP gauge increases above limit 150mmWG. Suspect choked | |
| 7 | PM CheckingCullet Conyevor system · PM checking (Checksheet) | 28 Oct 2026 | Monthly | Haikal | PM checking routine monthly frequency | |
| 8 | LOTO Mixer 3Mixer 3 · Support & assist Operation/Mechanical | 28 Oct 2026 | 2week | Haikal | LOTO Mixer 3 for cleaning and servicing by mechanical team | |
| 9 | Replace exchange valveFiring Exchange valve 4P Left · Support & assist Operation/Mechanical | 29 Oct 2026 | One-off | Haikal | Prod finding exchange valve 4P left back fire. plan to replace with spare | |
| 10 | Cleaning ITV PanelITV Camera CCTV · PM Routine | 30 Oct 2026 | Monthly | Syed & Haikal | Cleaning dust inside ITV panel to ensure system function well | |
| 11 | Replace ITV monitor - 4pcsITV Camera CCTV system · Corrective/Repair Maintenance | 02 Nov 2026 | One-off | Haikal & Fazreen | Replace ITV Monitor 4pcs due to wear & tear | |
| 12 | PM checking Batch PlantBatch Plant area · PM checking (Checksheet) | 02 Nov 2026 | Monthly | Haikal | PM checking routine monthly frequency | |
| 13 | 5S housekeepingAll Dust Collector · 5S & Housekeeping | 03 Nov 2026 | One-off | Wan Mahassan & Team | 5S housekeeping all dust collector. preparation for DOE audit | |
| 14 | Assit Swap Top roll 5A & 5CTop Roll 5A & 5C · TRT/Hot Clean | 03 Nov 2026 | Quarterly | Shift Utility | Replace with spare unit Top roll 5A & 5C | |
| 15 | Check TC A zone Top Right & Adjust positionLehr TC A zone Top Right · TRT/Hot Clean | 03 Nov 2026 | One-off | Production | Finding Trend Temp Right fluctuate. A zone Top Right TC | |
| 16 | Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean | 03 Nov 2026 | 2week | Shift Utility | Support and assist prod to changeover blower BBCF & HP | |
| 17 | Check Heater A zone Top B, C, DLehr Heater A zone Top B, C, D · TRT/Hot Clean | 03 Nov 2026 | One-off | Syed & Haikal | Temperature Present Value cannot reach Set Value. different about 2~3 degree | |
| 18 | Check damper C zone bottom rightLehr damper C zone bottom Right · TRT/Hot Clean | 03 Nov 2026 | Monthly | Syed & Haikal | Request from prod issue with auto damper malfunction. | |
| 19 | Replace heater A zone Top B1Lehr Heater A zone Top B1 (FR1) · TRT/Hot Clean | 03 Nov 2026 | One-off | Syed & Haikal | Finding heater bend and touch the glass issue | |
| 20 | PM checking Lehr areaLehr area · PM checking (Checksheet) | 03 Nov 2026 | Monthly | Syed & Haikal | PM checking routine monthly frequency | |
| 21 | SIP project Smoke DetectorHot end Smoke Detector · Safety Improvement Plan (Special Job) | 04 Nov 2026 – 07 Nov 2026 | One-off | Syed & Haikal | 1. Install smoke detector, panel smoke detector 2. Check route new cable for Lehr area | |
| 22 | Test and Replace blower fanEV Weighing Dolomite · Corrective/Repair Maintenance | 04 Nov 2026 – 05 Nov 2026 | One-off | Wan Mahassan/Syed & Haikal | Finding blower fan abnormal sound suspect bearing motor damaged. | |
| 23 | PM checking Batch PlantSilica sand area · PM checking (Checksheet) | 05 Nov 2026 | Monthly | Syed & Haikal | PM checking routine monthly frequency | |
| 24 | Repair install bracket solenoid valveBatch Charger 1-4 · PM Finding Repair | 10 Nov 2026 – 14 Nov 2026 | One-off | Syed & Haikal | Finding by Masa-san: The solenoid valve batch charger 1-4 is not properly mounted. | |
| 25 | PM checking batch plant areaBatch Plant area · PM checking (Checksheet) | 10 Nov 2026 | Monthly | Syed & Haikal | PM checking routine monthly frequency | |
| 26 | Replace Lehr Break sensor centreLehr Break 1 · TRT/Hot Clean | 11 Nov 2026 | One-off | Syed & Haikal | Found sensor for Lehr Break 1 melted and malfunction | |
| 27 | Check Heater A zone Top & BottomLehr Heater A zone Top & Bottom · TRT/Hot Clean | 11 Nov 2026 | One-off | Syed & Haikal | PM checking TRT-Routine. Finding ATC C3 cable snapped. repairs replace loop cable. done | |
| 28 | Replace Thermocouple Tin Bay 13LTin Bay 13L · TRT/Hot Clean | 11 Nov 2026 | One-off | Shift Utility | Prod finding temp tin bay 13L low and different than tin bay 13R. | |
| 29 | PM checking cullet conveyor systemCullet Conveyor system · PM checking (Checksheet) | 12 Nov 2026 | Monthly | Syed & Haikal | PM checking routine monthly frequency | |
| 30 | PM checking batch plant areaBatch Plant area · PM checking (Checksheet) | 16 Nov 2026 | Monthly | Syed & Haikal | PM checking routine monthly frequency | |
| 31 | Weight test and calibrationWeighing system Raw material · PM Routine | 17 Nov 2026 | 6month | Syed & Haikal | Weight test and calibration for raw material every 6month (Silica sand 1, Silica sand 2, Dolomite, Soda Ash, Limestone & Salt cake | |
| 32 | PM checking Distributor, Batch & B+C areaDistributor, Batch & B+C area · PM checking (Checksheet) | 18 Nov 2026 | Monthly | Syed & Haikal | PM checking routine monthly frequency | |
| 33 | Replace Lehr Break sensor centre & rightLehr Break 1 · TRT/Hot Clean | 19 Nov 2026 | One-off | Syed & Haikal | Found sensor for Lehr Break 1 melted and malfunction (Centre & Right) | |
| 34 | Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean | 19 Nov 2026 | 2week | Shift Utility | Support and assist prod to changeover blower BBCF & HP | |
| 35 | Assit Swap Top roll 6A & 6CTop Roll 6A & 6C · TRT/Hot Clean | 19 Nov 2026 | Quarterly | Shift Utility | Replace with spare unit Top roll 5A & 5C | |
| 36 | PM checking bath areaBath area · PM checking (Checksheet) | 20 Nov 2026 | Monthly | Syed & Haikal | PM checking routine monthly frequency | |
| 37 | Cleaning and Servicing EV weighing DolomiteEV weighing Dolomite · PM Routine | 23 Nov 2026 | Monthly | Wan MH & Team | Cleaning and servicing routine monthly | |
| 38 | Replace blower fan EV weighing DolomiteEV weighing Dolomite · PM Finding Repair | 24 Nov 2026 | Monthly | Wan MH & Team | Replace blower fan. Finding blower fan abnormal sound due to shaft motor wobbling. | |
| 39 | Annual servicing & calibration5D Scanner · TRT/Hot Clean | 25 Nov 2026 – 27 Nov 2026 | Yearly | Joseph & Zuhairi | 5D Scanner annual calibration & servicing. checking 5D scanner slave PC new version problem need to configuration setting. | |
| 40 | Repair install bracket solenoid valveBatch Charger 1-4 · PM Finding Repair | 25 Nov 2026 – 27 Nov 2026 | One-off | Syed & Haikal | Finding by Masa-san: The solenoid valve batch charger 1-4 is not properly mounted. | |
| 41 | O2 analyser calibration by OGMO2 analyser for N2 & H2 · PM Routine | 26 Nov 2026 | Yearly | OGM/Syed & Haikal | O2 analyser calibration by OGM annually | |
| 42 | Assist Changeover blower BathBlower HP, BBCF · TRT/Hot Clean | 26 Nov 2026 | 2week | Shift Utility | Support and assist prod to changeover blower BBCF & HP | |
| 43 | Cleaning and Servicing EV gathering CV & mixerEV gathering CV & mixer · PM Routine | 27 Nov 2026 | Monthly | Wan MH & Team | Cleaning and servicing routine monthly | |
| 44 | Replace exchange valveFiring Exchange valve 4P Right · Support & assist Operation/Mechanical | 27 Nov 2026 | One-off | Syed & Haikal | Prod finding exchange valve 4P right back fire. plan to replace with spare | |
| 45 | Lay new cable for emergency siren and testEmergency Siren · PM Finding Repair | 30 Nov 2026 – 02 Dec 2026 | One-off | Syed & Haikal | Check and do assessment for route cable power supply for emergency siren furnace |
Data & backup
Import, export and maintain your local data safely.
Import maintenance data
Load records from a CSV file.
Use the CSV template to see the expected column names. You can choose to merge imported records or replace the current list.
Export & backup
Download a copy of your maintenance records.
Update the existing dashboard HTML file with your current records, or export CSV for spreadsheet backup.
Local storage status
Records are saved in this browser profile.
Clearing data cannot be undone unless you have exported a backup. This action only affects this application's records in this browser.